Loading
port/jetty equipped with crushing machines
and conveyors with loading rate of 1’400
MT/hour will ensure timely delivery and
standard quality. The port/jetty can accommodate
up to 300 footer barges. SSDK has been
awarded the concession to collect toll
from The Kintap river by the Authority
which is used to conduct the dredging
works and maintenance of the river depth
from time to time. |
With
the front water depth of 5.5 meters, barges
of any size are able to pass through.
The transshipment from port/jetty to the
vessel at the open sea anchorage point
of Muara Satui (Lat. 3 º- 56’-
40 ”S Log. 115 º- 31’-
45 ”E) is approximately 5 miles
away from crushing plant/stock pile jetty. |